Overflow Parking

Total Estimate Cost:  $500.0K
Completed

As passenger travel through the airport continues to increase demand for vehicle parking is rising in lock-step. The rate of increase in vehicle parking is outstripping planning expectations. The construction of this gravel lot is creating additional overflow parking to meet demand during peak travel periods. More than 200 new spaces will be built using ‘millings’ from the runway overlay project as base material for this new lot. The parking surface will not be paved but the walking aisles between the rows will be. The lot provides easy walking access to the terminal building.